After a lot of working around our schedules and a lot of cancelling on other plans, we finally have a date for the larger part of our production: The fight scene.
Here is our schedule for the production.
Date: Saturday March 16th 2019
Location: Markham Park
Time: Crew Arrives at 6, Extras arrive at 7:30
6:00: Crew arrives at park to set up
5:00-7:00: Set up camera equipment/Get actors into costumes
7:00-7:20: Go over fight choreography with actors
7:20-7:30: Apply makeup/oil on main actors.
7:30-7:45: Wait for extras to arrive and put them into their positions upon arrival.
7:45-8:00: Briefly go over what the story is with extras (they have already been told what it is). Give them directions on how to react in parts of the fight.
8:00-8:45: Film scene following a shot list.
8:45-9:00 Clean Up
9:00-Until I fall asleep: Go crazy because I finally filmed my film opening!
Another very important part of our production is the equipment that we use. With the right equipment we are able to capture something that not only captures the viewer with a good story, but also with good quality image and sound. This is some of the equipment that will be used for our film opening:
Canon 7D Mark 2
Canon 24-70 MM Lens
Canon 35 MM Lens
DJI Ronin S
Work Lights from Home Depot
Shoulder rig for Canon camera
Rode Videomicro External Microphone
No comments:
Post a Comment